Solar Power Generation Landscape in India

By Team Eninrac February 2023

Solar Power Installed Capacity

Rajasthan leads the installed capacity with over 16 GW base followed by Gujarat & Karnataka with 8.5 GW and 7.9 GW installed capacity respectively

solar-power-generation-01.png

Solar Rooftop Promotion

bbg

Phillip to Rooftop Solar – Government Sid

• Launch of Rooftop Solar Programme phase II with CFA for residential sector and incentives in slabs for the DISCOMs for achievement of additional RTS Capacity

• Launch of National Portal where residential consumers from any part of the country can apply for installation of RTS and subsidy will be directly credited into their bank account under the Programme.

• Applicability of CFA for RTS plants under Virtual Net Metering for a group of residential consumers in rural areas.

• Development of online portals at DISCOM level and aggregation of demand relating to RTS projects.

• Preparation of model MoU, PPA and Capex Agreement for expeditious implementation of RTS projects in Government Sector.

Facilitation of concessional loans from multilateral agencies such as the World Bank.

Solar Parks – Status Quo

57 Solar Parks with an aggregate capacity of 39.25 GW is approved under “Development of Solar Parks & Ultra Mega Solar Projects” in India

solar-power-generation-01.png

Solar PV Module Manufacturing

21.68 GW/annum of installed Solar PV Module Manufacturing as per ALMM List

solar-power-generation-05.png

Solar Pumps & PM-KUSUM

500408 Solar Pumps on standalone basis have been installed in India & 0.64 MTs CO2 emission reduction achieved through PM-KUSUM

solar-power-generation-06.png

For any customized market research, consulting & advisory needs drop a query at - connect@eninrac.com

Related Posts

Read More
What would be the key drivers of cost competitiveness in India?
July 2023
What would be the key drivers of cost competitiveness in...

Drivers of cost competitiveness of hydrogen in India TCO is drive

Modelling levelised cost of hydrogen under scenario based circumstances for India for PEM Electrolysis
August 2023
Modelling levelised cost of hydrogen under scenario based circumstances for...

Levelised Cost of Hydrogen – PEM While using PEM te

Discom wise Estimated Power Sales & Annual Revenue Requirement in Madhya Pradesh for  FY 2023-24
February 2024
Discom wise Estimated Power Sales & Annual Revenue Requirement in...

Estimated sales of Madhya Pradesh Discoms for FY 2023-24 Number o