Levelised Cost of Hydrogen – PEM

While using SOE technology the LCOH is projected to be USD 8.86/kWh by 2050 under Base Case Scenario while electricity is being fed through grid. Further, the LCOH is expected to be USD 9.55/kWh & USD 8.17/kWh under High Case Scenario & Low Case Scenario respectively by 2050.

Under base scenario the LCOH comes out to be USD 7.48/kWh in 2020 while using power through grid. Further, LCOH comes out to be USD 6.73/kWh while feeding power through solar & USD 6.60/kWh while feeding power through wind under in 2020.

global-pathways.png

This perspective is part of Eninrac's 2023 Green Hydrogen Industry Report.
bbg

Grid Fed: Under base case scenario the LCOH for year 2020 & 2050 comes out to be USD 7.18/kWh & USD 8.86/kWh respectively. Under lower case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.99/kWh & USD 8.17/kWh respectively. Under high case scenario the LCOH for year 2020 & 2050 comes out to be USD 7.91/kWh & USD 9.55/kWh respectively.

Solar Fed: Under base case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.73/kWh & USD 7.72/kWh respectively. Under lower case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.5/kWh & USD 7.38/kWh respectively. Under high case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.88/kWh & USD 8.07/kWh respectively.

bbg
bbg

Wind Fed: Under base case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.60/kWh & USD 7.71/kWh respectively. Under lower case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.38/kWh & USD 7.32/kWh respectively. Under high case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.81/kWh & USD 8.09/kWh respectively.

For any customized market research, consulting & advisory needs drop a query at - connect@eninrac.com

Previous Insight

Next Insight

Related Posts

Read More
PM KUSUM Scheme Progress in India
January 2025
PM KUSUM Scheme Progress in India

1. PM Kusum Capacity Development The PM-KUSUM scheme aims to target an addition of 34,800 MW of solar capacity by...

Evaluating the utility of hydrogen refueling stations in reducing cost of hydrogen
July 2023
Evaluating the utility of hydrogen refueling stations in reducing cost...

Retrofitted pipelines can achieve very low H2 transportation cost i.e. less than or equal to USD 0.1/kg for upto 500...

In COVID - 19 Aftermath, Why Strategic Focus Upon Risks & Recovery Pace for PPP Projects are Paramount? R K Tripathy from CIRC Emphasizes Upon Renewed Modus Operandi for PPP Model
May 2020
In COVID - 19 Aftermath, Why Strategic Focus Upon Risks...

With reduced economic activity, due to the pandemic ou